TLS-450 Programming

Look here for answers to your technical questions. Post a question or share your expertise with others.
nighthawkrebuilder
Head Tech
Posts: 137
Joined: Fri Mar 24, 2017 9:45 am
Location: Wheatridge, Co

TLS-450 Programming

Post by nighthawkrebuilder » Wed Jan 03, 2018 2:16 pm

How can I aquire a programming guide for the TLS-450? Any suggestions or reference links are greatly appreciated.
Junior(Mike)
Global Petroleum Electronics Rebuilders
303-403-0761
mjmorgan@gogper.com

User avatar
xardoz
Head Tech
Posts: 1169
Joined: Fri Jan 04, 2008 1:31 pm
Location: Chehalis, WA
Contact:

Re: TLS-450 Programming

Post by xardoz » Wed Jan 03, 2018 3:23 pm

https://online.hillsdale.edu

Any society that would give up a little liberty to gain a little security will deserve neither and lose both.
Benjamin Franklin

Fueltechpro
Head Tech
Posts: 36
Joined: Tue Aug 22, 2017 11:38 am

Re: TLS-450 Programming

Post by Fueltechpro » Wed Jan 03, 2018 5:53 pm

Here is Programming for 450 plus
First things Turn off the breaker

Remove backup battery cover from the back inside

Check for continuity, connect the wire with sensor, probe, dispenser connect line wise 1,2,3,4,to 16 STP Probe, STP Sum Sensor and dispenser pan Sensor in the Veeder Root

Strip wires and check for The condudity

Connect wire with Probe, STP Sum Sensor, Dispenser connect them Numbers wise 1,2,3,4 to 16 First goes Probe, Second goes STP Sum Sensor, Third will be Dispenser Pan Sum Sensor

Turn On the Breaker
Go to the Menu --- Setup ---Workflow Wizard
Setup workflow wizard Press next
Setup Date and time not to worry about Time Zone.
Next go to Header 1, Store name Header 2 address, Header 3 City and Zip code.
Press Next Button till you see ---
Setup Devices --- Make sure to do

Configured ---Enabled,
Address --- B1.S1.1
Label Regular --- 30K
Float Type 4.0 In Phase Separation this setting is for Probe ---1, go to

Probe ---2
Configured ---Enabled,
Address --- B1.S1.2
Label Super --- 5K
Float Type 4.0 In Phase Separation

Probe ---3
Configured ---Enabled,
Address --- B1.S1.3
Label Diesel --- 5K
Float Type 4.0 In Phase Separation

Probe ---4
Configured ---Enabled,
Address --- B1.S1.4
Label Truck Diesel --- 30K
Float Type 4.0 In Phase Separation

Probe ---5
Configured ---Enabled,
Address --- B1.S1.5
Label DEF --- 5K
Float Type 4.0 In Phase Separation
Next, go to

Setup Tank General

Configured Enabled
Tank Label ---Regular 30K
Product Color Yellow
Full Volume capacity --- 29816.00 this number got it from Tank Chart
Diameter --- 120.000
Thermal Coefficient 0.000700 For Gas

Configured Enabled
Tank Label ---Super 5K
Product Color Red
Full Volume capacity --- 4871 this number got it from Tank Chart
Diameter --- 120.000
Thermal Coefficient 0.000700 For Gas

Configured Enabled
Tank Label ---Diesel 5K
Product Color Blue
Full Volume capacity ---
Diameter --- 120.000
Thermal Coefficient 0.000450 For Diesel

Configured Enabled
Tank Label ---Truck Diesel 5K
Product Color Blue
Full Volume capacity ---
Diameter --- 120.000
Thermal Coefficient 0.000450 For Diesel

Configured Enabled
Tank Label ---DEF 5K
Product Color Blue
Full Volume capacity --- this number got it from Tank Chart
Diameter --- 120.000
Thermal Coefficient 0.000400 For DEF

Delivery Delay --- 10minutes
Gross Test Fail --- Disabled
Periodic Test --- Disabled
Limits
Max Volume --- 29816.00 Tank Chart
Need to do above setting for all the Tanks. Regular---Super---Diesel---DEF Tank
High Product % 90
Delivery overfill % 10
Low Product got 3000 number
Has to be 10% of the Tank Size
High water warning 1.5 Inch
High water Alarm 2.00 Inch
Tank Test Method CSLD need to do it for all Tanks Regular---Super---Diesel---DEF Tank

Next Profit
Tank Profile --- Four Point
Full Volume 120 Inch ---29816.00
90.Inch gal ---24227.00 Regular Tank
60.Inch gal --- 15010.00
30.Inch gal --- 5761

Need to do above setting for all Tank
Super---Diesel---DEF above number

Auto Events Print Tasks
Daily 5:00 AM
Reports CSLD Daily Test Report
CSLD Monthly Report
Daily Correct Inventory Report
Most Recent Delivery Report
Delivery Complete do the Checkmark

Menu --- Setup --- Devices --- Probe
Press Probe arrow button

Configured Enabled Tank 1
Address B1.S1.6
Label Regular
Category STP Sump

Configured Enabled Tank 2
Address B1.S1.7
Label Super
Category STP Sump

Configured Enabled Tank 3
Address B1.S1.8
Label Diesel
Category STP Sump

Configured Enabled Tank 4
Address B1.S1.9
Label Truck Diesel
Category STP Sump

Configured Enabled Tank 5
Address B1.S1.10
Label DEF
Category STP Sump

Menu --- Setup --- Devices
Press Left Side Button Liquid Sensor

Need to set up Dispenser setting

Fueltechpro
Head Tech
Posts: 36
Joined: Tue Aug 22, 2017 11:38 am

Re: TLS-450 Programming

Post by Fueltechpro » Wed Jan 03, 2018 5:53 pm

I hope this helps you.

dmcginnis89
Head Tech
Posts: 579
Joined: Wed Feb 26, 2014 3:36 am

Re: TLS-450 Programming

Post by dmcginnis89 » Wed Jan 03, 2018 6:33 pm

Fueltechpro wrote:
Wed Jan 03, 2018 5:53 pm
Here is Programming for 450 plus
First things Turn off the breaker...
I thought that after that the next steps were gonna be:

"take off wall and install 350."

I won't ever forget my first weekend on call...spent all night trying to get an analog LLD to work on a 450. lol. haven't made that mistake since.


eromlo49
Head Tech
Posts: 163
Joined: Sat Jan 10, 2015 7:57 am

Re: TLS-450 Programming

Post by eromlo49 » Thu Jan 04, 2018 5:07 am

I find the omntec proteus one of the easiest gui to follow!

nighthawkrebuilder
Head Tech
Posts: 137
Joined: Fri Mar 24, 2017 9:45 am
Location: Wheatridge, Co

Re: TLS-450 Programming

Post by nighthawkrebuilder » Thu Jan 04, 2018 9:32 am

Thank you FuelTech ;)
Junior(Mike)
Global Petroleum Electronics Rebuilders
303-403-0761
mjmorgan@gogper.com

aplawson
Head Tech
Posts: 27
Joined: Tue Feb 24, 2009 11:34 am

Re: TLS-450 Programming

Post by aplawson » Fri Jan 26, 2018 9:06 am

Damn near fell outa my chair.....
Failure to plan on your part does not constitute an emergency on my part.

Petropimp
Newbie
Posts: 2
Joined: Mon Jan 13, 2020 9:39 am

Re: TLS-450 Programming

Post by Petropimp » Mon Jan 13, 2020 10:03 am

is there a way to print a daily CSLD report for all tanks ? its the same print out that happens every morning at 5 or 8 am

User avatar
CherokeeUST
Head Tech
Posts: 609
Joined: Mon Feb 14, 2005 8:23 am
Location: Dallas, Texas
Contact:

Re: TLS-450 Programming

Post by CherokeeUST » Tue Jan 14, 2020 7:10 am

nighthawkrebuilder wrote:
Wed Jan 03, 2018 2:16 pm
How can I aquire a programming guide for the TLS-450? Any suggestions or reference links are greatly appreciated.
TLS-450 Setup and Operation Screens Manual

http://docs.veeder.com/gold/gold_public ... rch_type=1
The opinions expressed here are entirely mine and are not endorsed by my employer.

Robert
www.linkedin.com/in/robertlargent

Post Reply