PEI RP 100 Updated

UST, service station, bulk plant, car wash, commercial refueling installation, design and construction.
Post Reply
User avatar
CherokeeUST
Head Tech
Posts: 695
Joined: Mon Feb 14, 2005 8:23 am
Location: Dallas, Texas
Contact:

PEI RP 100 Updated

Post by CherokeeUST » Wed Apr 26, 2017 7:19 am

Changes in the 2017 edition:

Ball float valves are no longer are an installation option.

Appendix C - resources on corrosion in USTs storing diesel and ethanol fuel blends.

Double-walled spill buckets are an installation option to consider.

Procedures, measurements and time requirements for containment sump testing.

“Release Detection” chapter morphed into a new “Leak Detection” chapter with practices for double-walled tanks and piping.

Updated illustrations and captions and added graphics on suction pumping, piping layouts and flexible connectors.


http://www.pei.org/rp100
The opinions expressed here are entirely mine and are not endorsed by my employer.
Robert

Join our UST Compliance Group.
https://www.linkedin.com/groups/8358167/

Post Reply